I am leaving the table of how many lots to demand and the #halkaarz information below.
🏛 Üçay Engineering Energy and Climate Technologies Inc. is going public
🎟 Transaction Code: #UCAYM 📆 Date: January 14-15-16 💰 Price: 18 TL ♻️ Distribution Method: Equal Distribution 🧾 Share: 60,000,000 LOT
💰 Public Offering Size: 1.1 Billion TL ☣️ Public Float: 22.73%
✅️ Public Offering Type 🔺️ Capital Increase: 50,000,000 LOT 🔺️ Partner Sale: 5,000,000 LOT (Ayhan Karacabey) 🔺️ Partner Sale: 5,000,000 LOT (Mustafa Bozkurt)
✅️ Use of Fund 🔹️ 40-50% Licensed or unlicensed solar power plant (GES) installation or purchase 🔹️ 30-40% Reduction of operational expenses, sustainability investments 🔹️ 10-15% Expansion of branch network 🔹️ 5-10% Electric vehicle charging station network installation
✅️ Allocation Groups 🔸️ 42,000,000 LOT (70%) Domestic Individual Investors 🔸️ 6,000,000 LOT (10%) High-application Investors 🔸️ 12,000,000 LOT (20%) Domestic Corporate Investors
❗️ Price Stability for 30 days. (50% of gross public offering income)
View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
Tomorrow Demand Collection Begins. #UCAYM
I am leaving the table of how many lots to demand and the #halkaarz information below.
🏛 Üçay Engineering Energy and Climate Technologies Inc. is going public
🎟 Transaction Code: #UCAYM
📆 Date: January 14-15-16
💰 Price: 18 TL
♻️ Distribution Method: Equal Distribution
🧾 Share: 60,000,000 LOT
💰 Public Offering Size: 1.1 Billion TL
☣️ Public Float: 22.73%
✅️ Public Offering Type
🔺️ Capital Increase: 50,000,000 LOT
🔺️ Partner Sale: 5,000,000 LOT (Ayhan Karacabey)
🔺️ Partner Sale: 5,000,000 LOT (Mustafa Bozkurt)
✅️ Use of Fund
🔹️ 40-50% Licensed or unlicensed solar power plant (GES) installation or purchase
🔹️ 30-40% Reduction of operational expenses, sustainability investments
🔹️ 10-15% Expansion of branch network
🔹️ 5-10% Electric vehicle charging station network installation
✅️ Allocation Groups
🔸️ 42,000,000 LOT (70%) Domestic Individual Investors
🔸️ 6,000,000 LOT (10%) High-application Investors
🔸️ 12,000,000 LOT (20%) Domestic Corporate Investors
✅️ Financial Table
2025/9
Revenue: 1.9 Billion TL
Gross Profit: 455.5 Million TL
✅️ Compliant with Participation Index
❗️ Price Stability for 30 days. (50% of gross public offering income)