Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
Stargate expansion postponed, Microsoft takes over Crusoe Texas Data Center Phase II
Mars Finance News March 30: Microsoft has recently reached a cooperation agreement with data center developer Crusoe, formally leasing its 700 MW computing capacity from the Phase 2 project located in the Abilene campus in Texas, further strengthening the foundation of artificial intelligence computing infrastructure. It is reported that the Abilene campus in Texas is the location of the Phase 1 “Stargate” AI data center project jointly built by OpenAI and Oracle. The Phase 1 build-out scale reaches 1.2 GW, and the Phase 2 project at the park was originally planned for expansion of the “Stargate” project. As OpenAI adjusts its computing capacity layout, additional capacity will be directed to other regions. Microsoft successfully secured this leasing cooperation. Previously, Meta has also expressed an interest in collaborating with this park site. (Wide-angle observation)