Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
BOE Energy applies for patents related to photovoltaic, energy storage, and charging station facilities. The optimization scheduling strategy is determined based on the specific scenario of the photovoltaic, energy storage, and charging station.
March 28, according to information from the State Intellectual Property Office, Beijing Orient Energy Technology Co., Ltd. has applied for a patent titled “Design Solution and Scheduling Solution Determination Method and Device for Photovoltaic-Energy-Storage-Charging Field Stations.”
The application publication number is CN121749363A, the application number is CN202511798726.9, the publication date is March 27, 2026, the application date is December 2, 2025, the inventors are Ma Liang, Zhang Haiyong, and Tang Chaonan, the patent agency is Beijing Formatted Intellectual Property Agency Affairs (General Partnership), and the patent agent is Xiang Wang. The classification numbers are H02J3/466, H02J3/32, B60L53/51, B60L53/31, G06Q10/0631, G06Q50/06, H02J101/24, H02J103/30, and H02J105/37.
The patent abstract shows that this disclosure is about a design solution and scheduling solution determination method and device for a photovoltaic-energy-storage-charging field station. The method includes: collecting target energy data; if the target energy data is used for the station’s early-stage design scenario, the target energy data is theoretical data obtained by modeling based on a physical model; if the target energy data is used for the station’s late-stage scheduling scenario, the target energy data is actual station operation collection data; determining an optimization objective based on the energy data and the station’s requirements. The optimization objective at least includes one or more of the following: minimizing an overload objective, maximizing an economic benefit objective, and maximizing an optimal utilization objective for renewable energy; constructing constraint conditions based on the energy data and actual limiting factors during station operation. The constraint conditions at least include one or more of the following: photovoltaic output constraints, energy storage system constraints, charging power constraints, vehicle charging constraints, and grid connection point constraints; comprehensively analyzing the optimization objective and the constraint conditions to obtain an optimization strategy adapted to the scenario; outputting the optimization strategy adapted to the scenario.
According to Tianyancha, Beijing Orient Energy Technology Co., Ltd. was established on August 26, 2009. Its legal representative is Ma Liang. The industry it belongs to is electricity, heat production and supply. The company size is medium. Its registered capital is 124269.0058 million RMB, and its paid-in capital is also 124269.0058 million RMB. Its registered address is Building 5, Floor 8, 8 KeGu Yi Street, Beijing Economic-Technological Development Area, Beijing. Beijing Orient Energy Technology Co., Ltd. has made external investments in 57 companies, participated in 264 bidding and tendering projects. In terms of property-related leads, it has 16 trademark information entries, 92 patent information entries, and 23 administrative licenses.
Beijing Orient Energy Technology Co., Ltd.’s recent patent situation is as follows:
Statement: The market involves risk; investment requires caution. This article is automatically published by an AI large model based on third-party databases, and does not represent opinions of Sina Finance. Any information appearing in this article is for reference only and does not constitute personal investment advice. In case of discrepancies, please refer to the actual announcements. If you have any questions, please contact biz@staff.sina.com.cn.
A wealth of information and precise analysis—only on the Sina Finance app
责任编辑:小浪快报