Today Shougang Changgang Construction Steel Price Adjustment Information

robot
Abstract generation in progress

On March 27, Shougang Changgang issued an information notice on the adjustment of building steel prices. Among them, the prices of HRB400E rebar, HRB400E wire rod, and HPB300 high-wire were reduced by 20 yuan/ton, respectively. The specific ex-works base prices are: for HRB400E rebar Φ20mm, 3120 yuan/ton; for HRB400E wire rod Φ8-10mm, 3210 yuan/ton; and for HPB300 high-wire Φ8-12mm, 3210 yuan/ton. HRB500E is priced at an additional 300 yuan/ton over the HRB400E price base. For iron-standard rebar (HRB400E) products, an additional 100 yuan/ton is added over national-standard rebar (HRB400E) products with the same grade and the same specification. (My Steel Network)

View Original
This page may contain third-party content, which is provided for information purposes only (not representations/warranties) and should not be considered as an endorsement of its views by Gate, nor as financial or professional advice. See Disclaimer for details.
  • Reward
  • Comment
  • Repost
  • Share
Comment
Add a comment
Add a comment
No comments
  • Pin