In the process of fall (No. 1 line drawing), Sideways finishing (No. 2 line drawing), and then quickly fall is also called digging pit (No. 3 line), No. 4 line is pulled back to No. 2 Sideways is called filling, and after finishing, it is pump waiting for verification
View Original